Semester 4 Main Project
YEAR: 2017
LOCATION: Lysholtparken, Velje
PROJECT DESCRIPTION: As defined in the project brief the main requirements were to have two independent office Towers connected by a bridge on the inside. A major focus was to design a floating skin system that appeared to wrap the building
Individually, I focused on the MEP and the bathrooms and its connections.
Floorplans
Elevations
Sections
Ventilation
Bathroom